Gas ye kɔnɔ laar ye kɔnɔ laar ye kɔnɔ laar ye kɔnɔ laar ye kɔnɔ laar ye kɔnɔ laar ye kɔnɔ laar ye kɔnɔ laar ye kɔnɔ laar ye kɔnɔ laar ye kɔnɔ laar ye. Roller part: inner roller, outdoor insulation two layers. Roller part: inner roller, outdoor insulation two layers. Roller part: inner roller, outdoor insulation two layers. Roller part: inner roller, outdoor insulation two layers. Kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ. Masin dɔ̈ɔ̈r ye tɔ̈u yen aye tɔ̈u në kaam ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye. Luɔi dɔ̈t, wëu dɔ̈t, wëu dɔ̈t, wëu dɔ̈t, wëu dɔ̈t, wëu dɔ̈t, wëu dɔ̈t, wëu dɔ̈t, wëu dɔ̈t, wëu dɔ̈t, wëu dɔ̈tOrganic fertilizer dryer luɔɔi
1, Dryer install should strictly conform to the requirements of assembly plan and foundation plan construction, before dryer install, it should always list its parts and its accessories, clean, clean and complete. 1, Dryer install should strictly conform to the requirements of assembly plan and foundation plan construction, before dryer install, it should always list its parts and its accessories, clean, clean and complete.
2.Since dryer is a long body large equipment, so installing should be carried out in this order and method. 2.Since dryer is a long body large equipment, so installing should be carried out in this order and method. 2.Since dryer is a long body large equipment, so installing should be carried out in this order and method:
(a) Lini de gɛɛl, gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl ye gɛɛl
(2) Lɔ̈ɔ̈i kɛ̈ɛ̈r kɛ̈ɛ̈r kɛ̈ɛ̈r kɛ̈ɛ̈r kɛ̈ɛ̈r
Flat mat position, draw out the base, the central line of the tractor, according to the drawing requirements, find the exact base and the tractor's installation location, flat and set right, first put the foundation hole pump, concrete reaches a certain strength when, tighten the ground foot bolt, check the qualified after installing the cylinder.
(3) Kuen cylinder ku roller
Fɔlɔ, aw ye roller tääu cylinder kɔnɔ, ka kɔnɔ, aw ye kɔnɔ, aw ye kɔnɔ, aw ye kɔnɔ, aw ye kɔnɔ, aw ye kɔnɔ, aw ye kɔnɔ, aw ye kɔnɔ, aw ye kɔnɔ, aw ye kɔnɔ, aw ye kɔnɔ, aw ye kɔnɔ, aw ye kɔnɔ, aw ye kɔnɔ, aw ye kɔnɔ, aw ye kɔnɔ
(4) Gɛɛr dït
Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ Rotate cylinder, check the radial beating and lateral swing of large gears, until calibration is qualified. Rotate cylinder, check the radial beating and lateral swing of large gears, until calibration is qualified. Rotate cylinder, check the radial beating and lateral swing of large gears, until calibration
(5) Gɛɛr, reducer, motɛr
Dryer's drying efficiency is high and low, largely dependent on the burning room's good or bad, therefore, during the dryer's operation, it must be given special attention to the burning room, blower and dust removal equipment. Dryer's drying efficiency is high and low, largely dependent on the burning room's good or bad, therefore, during the dryer's operation, it must be given special attention to the burning room, blower and dust removal equipment.
2, ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ
Organic fertilizer dryer luɔɔi
(1) Ka tɛ̈ɛ̈r ka tɛ̈ɛ̈r ka tɛ̈ɛ̈r ka tɛ̈ɛ̈r ka tɛ̈ɛ̈r ka tɛ̈ɛ̈r ka tɛ̈ɛ̈r ka tɛ̈ɛ̈r ka tɛ̈ɛ̈r ka tɛ̈ɛ̈r ka tɛ̈ɛ
(2) Ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ
(3) Fɛɛrɛ ye kɔnɔ, a ye kɔnɔ, a ye kɔnɔ, a ye kɔnɔ, a ye kɔnɔ, a ye kɔnɔ, a ye kɔnɔ, a ye kɔnɔ, a ye kɔnɔ, a ye kɔnɔ, a ye kɔnɔ, a ye kɔnɔ, a ye kɔnɔ, a ye kɔnɔ.
3, during the dryer operation to often check the various parts of bearing temperature, the temperature should not exceed 50°C, gear voice response smooth, transmission, support and cylinder rotation should not be obvious impact, vibration and transmission, and should also often do good equipment inspection, maintenance and maintenance work, its content should include:
(1) Bolt fasteners fɛɛr dɛ wala loose phenomenon.
(2) Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ.
