<unk>Q GDW 1356-2013 Three Phase Smart Electric Meter Type Specification<unk>
"Q GDW 1827-2013 Three Phase Intelligent Power Meter Technical Specifications" (Kä ye looi në "Q GDW 1827-2013 Three Phase Intelligent Power Meter Technical Specifications")
GB/T 17215.211-2006 General Requirements for AC Electrical Measurement Equipment Test and Test Conditions Part 11: Measurement Equipment
No need for wiring, easy installation, low operating cost. No need for wiring, easy installation, low operating cost. No need for wiring. No need for wiring. No need for wiring. No need for wiring. No need for wiring. No need for wiring. No need for wiring.
A sɔrɔ network, a jump to internet to telecommunication, mobile, intercom and other communication operators cloud platform;
High reception sensitivity, a wide coverage;
A kony hot plugging;
Support local upgrades and wireless remote upgrades (Lɔ̈ɔ̈i de baai ku lɔ̈ɔ̈i de baai)
Structure de forme et définition de interface sont conformes aux spécifications de type de table intelligente triple phase de réseau national;
a tɛmɛ wɛ̈t cï kek ya looi në GB/T 17215;
A lëu bï ya tɔ̈ɔ̈u në 2400, 9600 serial port ports.
A tɛmɛ ne carrier/wireless module interface ye tɔ̈u yen, a yic a waar.
Teknik Specifications |
Parameters |
Voltage ye luui |
DC12V+/-1V |
Power consumption |
Wala ka di1.5W |
Puwol bɛ̈n |
Max23dBm |
Sensitivity ye yök |
-107.5dBm @3GPP |
Interface ë komunikasyon |
YüksekNB-IoTLɔ̈k pinyUART |
Porter Rate Serial |
2400/9600bpsA lëu a konfigure |
Band de luɔi |
B1,B3,B5,B8 |
Operator's Support |
China Mobile, China Telecom, China Unicom |
Luɔi Cloud Platform |
Mobile OneNet, Telecom OceanConnet, Alibaba Cloud, kɔc juëc |
Protokol habar |
DL/T645-2007 protocol,MQTT, COAP, LwM2M, ku jɔl ya IoT protocols juëc |
SIM kaar |
A kony ESIM ku Micro-SIM |
Temperature de luɔi |
-25℃~70℃ |
Humidity de travail |
10%~95%RHNo condensation |
Size |
94.8mm(Long)×65mm(Width)×27mm(Yüksek) |
