Daoqiao Industrial Equipment (Shanghai) Co., Ltd.
Kuæa>Proizvodi>Pulsafeeder GLM Pump ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye
Informacije o firmi
  • Nivo transakcije
    Član VIP
  • Kontakt
  • Telefon
    17317910986
  • Адрес
    Shanghai, 186 Puting Road, Yishe Town, Songjiang District, Shanghai
Kontakt sada
Pulsafeeder GLM Pump ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye
Pulsafeeder GLM Pump ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye
Detalji proizvoda

Pasfida GLM pomp- Parameters
Lɔ̈ɔ̈i: 0--3200L/h
Pɛɛr: 0-12 bar
Tɛɛr: 70-187
Motor Power: 0.25-1.5kw
Pump head material: 316L, PP, PVDF
Tɛmɛ: 0-45 ℃
Tɔŋ: ±2

Pasfida GLM pomp- Material
Pump head: PP, PVDF, 316L stainless steel
Film: PTFE multi-layer composite film
Valve ball: ceramic wala stainless steel
Pump shell: Aluminium alloy
Base: Stainless steel wala coated steel
Pump head connector: PP wala cast iron (ETFE coating)
Lubrication: Oil bath
Painting: Epoxy Paint

Pasfida GLM pomp<unk> Apply
● Pii Municipal
● Cooling Tower Water Treatment
● Demineral regenerator
● Pii dɔ̈ɔ̈r dɔ̈ɔ̈r
● Petrochemical/chemical/refining process applications
● Pii kɔl kony kony kony kony kony kony kony kony kony kony kony kony kony kony kony kony kony kony kony kony kony kony kony kony kony kony kony kony kony
● Industri kɔ̈k

Pasfida GLM pomp- Karakteristika
GLM ye pomp ye tɔ̈ɔ̈u ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor.
Gear box ye looi në bath lubrication yic, ku baara ye tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u.
Fɛɛrɛ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ.
High-strength composite diaphragm has a good durability.
Plunger dït, ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ.
Stroke automatic locking function, ye kɔc cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk
A dɔŋ a dɔŋ a dɔŋ a dɔŋ a dɔŋ a dɔŋ a dɔŋ a dɔŋ a dɔŋ a dɔŋ a dɔŋ a dɔŋ a dɔŋ.

Pasfida GLM pomp<unk> Install points
Pipeline has to be correct, and the pipeline has to be installed on the damper, filter, safety valve, and oil replenishment valve, so as to achieve a stable flow and pressure, so as to achieve a precision of addition. Pipeline has to be correct, and the pipeline has to be installed on the damper, filter, safety valve, and oil replenishment valve, so as to achieve a stable flow and pressure, so as to achieve a precisi

Yer
Na cï yïn tɛ̈n yenë yen tɔ̈ɔ̈u thïn ku jɔl ya tɛ̈n yenë yen tɛ̈n yenë yen tɔ̈ɔ̈u thïn, ke yïn adhil ba tɛ̈n yenë yen tɔ GLM ® DM7 pump alëu bï ya luɔ̈ɔ̈i në ɣön kɔ̈k yiic ku jɔl ya ɣän kɔ̈k yiic, nka a ka dhil ya luui në ɣän kɔ̈k yiic. Na tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë t Y sã n dat n bãng tɛ yen tɛ yen tɛ yen tɛ yen tɛ yen tɛ yen tɛ yen tɛ yen tɛ yen tɛ yen tɛ yen tɛ yen tɛ yen tɛ yen tɛ yen tɛ yen. Pump adhil ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka t Ka tɛmɛ pomp ye kɛ̈ɛ̈r ye, a ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ. Pump's horizontal deviation should be within 5° to ensure the normal operation of the stopping valve. Pump's horizontal deviation should be within 5° to ensure the normal operation of the stopping valve. Pump's horizontal deviation should be within 5° to ensure the normal operation of the stopping valve.

Sistɛm pipi
1. Valve de gël de sistem ye looi bï gël de pip ku käke luɔɔi (cïmën de pomp) bï gël de gël de gël de gël de gël de gël de gël de gël de gël de gël de gël de gël de gël de gël de gël A wïc ba valves de gël ya tɔ̈ɔ̈u! Kɔc cïï puɔ̈ɔ̈c bɛ̈n ya cɔk tɔ̈ɔ̈u në kaam de pomp yic ku valve de gël.
2. A lëu bï valves ku pipe joints (wala flanges) ya tɔ̈ɔ̈u në luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi. Ajuiɛɛr kënë alëu bï valve de stop ya tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ. Valve dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r. Ball valves alëu bï ya luɔ̈ɔ̈i nhial, sabu ka tɛ̈n tɔ̈ɔ̈u ye tɛ̈n tɔ̈ɔ̈u ye tɛ̈n tɔ̈ɔ̈u ye tɛ
3. Import filter (të cenë yen luɔɔi tënë pump products). Pump return valve ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ Filter adhil tɔ̈u kaam de valve ye tɔ̈ɔ̈u në pip de lɔ̈ɔ̈m ku valve ye tɔ̈ɔ̈u në pump de lɔ̈ɔ̈m. A ka dɔ̈ɔ̈r adhil bɛ̈n ya looi në tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈ 100 ye filter ye looi.
4. Vacuum meter/pressure meter on import and export pipeline, used to check system operation. 4. Vacuum meter/pressure meter on import and export pipeline, used to check system operation. 4. Vacuum meter/pressure meter on import and export pipeline, used to check system operation. Pressure meter adhil ka tɔ̈ɔ̈u në kaam de valve ye tɔ̈ɔ̈u në kë de gël ye tɔ̈ɔ̈u në kë de gël ye tɔ̈ɔ̈u në kë de gël ye tɔ̈ɔ̈u.
5. Pipe weight can't be supported by valve cover or other pump head parts, because its stress can cause leakage. Pipe weight can't be supported by valve cover or other pump head parts, because its stress can cause leakage. Pipe weight can't be supported by valve cover or other pump head parts, because its stress can cause leakage. Na yɔ̈ɔ̈k, a lëu bɛ̈n ya looi ka tɛ̈n yenë kɔnɔ tɛ̈n yenë kɔnɔ tɛ̈n yenë kɔnɔ tɛ̈n yenë kɔnɔ tɛ̈n yenë kɔn
6. Ha tɛ̈n yenë pip ya tɔ̈ɔ̈u thïn, a adhil a tɔ̈ɔ̈u thïn ka tɔ̈ɔ̈u thïn ka tɔ̈ɔ̈u thïn ka tɔ̈ɔ̈u thïn. Users who use sealing tape should be more attentive to ensuring that they don't seal the entrance pipeline thread head, and ensure that using again has previously removed the sealing tape from the old thread. Users who use sealing tape should be more attentive to ensuring that they don't seal the entrance pipeline thread head, and ensure that using again has previously removed the sealing tape from the old thread. Pipes yam wala tɔ̈u bɛ̈ɛ̈i dɔ̈ɔ̈r bɛ̈ɛ̈i dɔ̈ɔ̈r bɛ̈ɛ̈i dɔ̈ɔ̈r bɛ̈ɛ̈i dɔ̈ɔ̈r bɛ̈ɛ̈i dɔ̈ɔ̈ Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ.

Requirements of pressure of entry
Na cɔk GLM ye pomp ye kɔc dɔ̈ɔ̈r ye kɔc dɔ̈ɔ̈r ye kɔc dɔ̈ɔ̈r ye kɔc dɔ̈ɔ̈r ye kɔc dɔ̈ɔ̈r ye kɔc dɔ̈ɔ̈r ye kɔc dɔ̈ɔ̈r ye kɔc Pump adhil tɔ̈ɔ̈u thiin koor ye tɔ̈ɔ̈u në biäk ye tɔ̈ɔ̈u në biäk ye tɔ̈ɔ̈u në biäk ye tɔ̈ɔ̈u në biäk ye tɔ̈ Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ. Na ye kë wɛ̈t kän tɔ̈ɔ̈u, pomp dɛ̈t lëu bɛ̈n ya gäm tɛ̈n yenë yen tɛ̈n yenë yen tɔ̈ɔ̈u. Na ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye Na cï yen rot tɔ̈ɔ̈u, bï pomp ya luui apath, a lëu ba pomp ya tɔ̈ɔ̈u. Na ye tubu ye cɔl inhalation line ye dɔɔni wala pump ye cɔl stroke number ye dɔɔni, ka tɛmɛ tubu ye cɔl inlet tube ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni. Yɔrɔ dɔw la, tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ N'a leŋ thil wɛ̈t kɛ kui tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈

Requirements for pressure output
Pumps GLM ye kek tɔ̈ɔ̈u aye tɔ̈ɔ̈u bï kek ya luui në tɛ̈n yenë kek tɔ̈ɔ̈u thïn. Na tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n Kä ye looi bɛ kɛ sababu ye tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ Walasa ka tɛmɛ yen, ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen 0.35 Bar (5 psi). Na yɔ̈ɔ̈r, a lëu bï yen ya looi në tɛ̈n yenë valve ye kɔc dɔ̈ɔ̈r ye tɔ̈ɔ̈u yen. Ka dɔ̈ɔ̈r, ka dɔ̈ɔ̈r bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈

Pasfida GLM pomp<unk> Modɛl

DM1A DM1C DM2A DM2C DM2E DM3C DM3D DM3E
DM1AYAB DM1CYAB DM2AYAB DM2CYAB DM2EYAB DM3CYAB DM3DYAB DM3EYAB
DM1AYAT DM1CYAT DM2AYAT DM2CYAT DM2EYAT DM3CYFB DM3DYFB DM3EYFB
DM1AYFB DM1CYFB DM2AYFB DM2CYFB DM2EYFB DM3CYPB DM3DYPB DM3EYPB
DM1AYFT DM1CYFT DM2AYFT DM2CYFT DM2EYFT
DM1AYPB DM1CYPB DM2AYPB DM2CYPB DM2EYPB DM3C3AB DM3D3AB DM3E3AB
DM1AYPT DM1CYPT DM2AYPT DM2CYPT DM2EYPT DM3C3FB DM3D3FB DM3E3FB
DM1A3AB DM1C3AB DM2A3AB DM2C3AB DM2E3AB DM3C3PB DM3D3PB DM3E3PB
DM1A3AT DM1C3AT DM2A3AT DM2C3AT DM2E3AT
DM1A3FB DM1C3FB DM2A3FB DM2C3FB DM2E3FB
DM1A3FT DM1C3FT DM2A3FT DM2C3FT DM2E3FT
DM1A3PB DM1C3PB DM2A3PB DM2C3PB DM2E3PB
DM1A3PT DM1C3PT DM2A3PT DM2C3PT DM2E3PT

DM4B DM4C DM4D DM5C DM5D DM5E DM6C DM6D
DM4BYAB DM4CYAB DM4DYAB DM5CYAB DM5DYAB DM5EYAB DM6CYAB DM6DYAB
DM4BYFB DM4CYFB DM4DYFB DM5CYFB DM5DYFB DM5EYFB DM6CYFB DM6DYFB
DM4BYPB DM4CYPB DM4DYPB DM5CYPB DM5DYPB DM5EYPB DM6CYPB DM6DYPB
DM4B3AB DM4C3AB DM4D3AB DM5C3AB DM5D3AB DM5E3AB DM6C3AB DM6D3AB
DM4B3FB DM4C3FB DM4D3FB DM5C3FB DM5D3FB DM5E3FB DM6C3FB DM6D3FB
DM4B3PB DM4C3PB DM4D3PB DM5C3PB DM5D3PB DM5E3PB DM6C3PB DM6D3PB

DM6E DM7A DM7B DM7C DM7D DM7J DM7K
DM6EYAB DM7AYAP DM7BYAP DM7CYAP DM7DYAP DM7JYAP DM7KYAP
DM6EYFB DM7AYFP DM7BYFP DM7CYFP DM7DYFP DM7JYFP DM7KYFP
DM6EYPB DM7AYPP DM7BYPP DM7CYPP DM7DYPP DM7JYPP DM7KYPP
DM6E3AB DM7A3AP DM7B3AP DM7C3AP DM7D3AP DM7J3AP DM7K3AP
DM6E3FB DM7A3FP DM7B3FP DM7C3FP DM7D3FP DM7J3FP DM7K3FP
DM6E3PB DM7A3PP DM7B3PP DM7C3PP DM7D3PP DM7J3PP DM7K3PP

Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!