Shanghai Meiyu Instrument Equipment Co., Ltd. (Shanghai Meiyu Instrument Equipment Co., Ltd.)
Kuæa>Proizvodi>Cement gum sand wear resistant testing machine operation method (Cement gum sand wear resistant testing machine operation method) (Cement gum sand wear resistant testing machine operation method)
Grupe proizvoda
Informacije o firmi
  • Nivo transakcije
    Član VIP
  • Kontakt
  • Telefon
    13524263611
  • Адрес
    No.680 Fengwan Road, Fengjing Town, Jinshan District, Shanghai
Kontakt sada
Cement gum sand wear resistant testing machine operation method (Cement gum sand wear resistant testing machine operation method) (Cement gum sand wear resistant testing machine operation method)
Cement gum sand wear resistance tester machine is used for cement gum sand, and can also be used for concrete, stone wear resistance testing, digital
Detalji proizvoda

TMS-04 Cement Glue Sand Wear Testing MachineLayout reasonable, structure compact, weight, integrity strong, appearance beautiful, operation simple, automation degree high. Layout reasonable, structure compact, weight, integrity strong, appearance beautiful, operation simple, automation degree high. Layout reasonable, structure compact, weight, integrity strong, appearance beautiful, operation simple, automation degree high. Cït mɛn cï lueel, an tɛ̈ŋ yen ye kë puɔth ye, a ɣɔɔc dɔɔni, a data tɛ̈ŋ ye, a ka tɛ̈ŋ ye, a ka tɛ̈ŋ ye, a ka tɛ̈ŋ ye. Kɛ̈ɛ̈l ye kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ ka kɔɔrɔ

TMS-04 Cement Glue Sand Wear Testing MachineYe luɔɔi:
1. ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ
2, ye tɛmɛ (ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye
3.Set the pressing head load to 20ON (without weighing), the electrical control box on the number of turns set to 30 turns, and adjust the vacuum cleaning device to the top of the test piece, then start pre-grinding (pre-grinding is to improve the contact situation of the test piece and grinding head, remove the surface net pulp, pre-grinding number can be changed on the test piece strength and surface flatness).
4. ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi, ye looi.
5. Lɔ̈k kä cï kek looi në tɛ̈n yenë kek tääu thïn në tɛ̈n yenë kek tääu thïn në tɛ̈n yenë kek tääu thïn në tɛ̈n yenë kek tääu thïn Tɛ̈n yenë kɔɔr tɛ̈n yenë kɔɔr tɛ̈n yenë kɔɔr tɛ̈n yenë kɔɔr tɛ̈n yenë kɔɔr tɛ̈n yenë kɔɔr tɛ̈n yenë kɔɔr tɛ
6. Calculate the wear amount, accurately to 0.01kg/m2. Calculate the wear amount, accurately to 0.01kg/m2. Calculate the wear amount, accurately to 0.01kg/m2.

Features:
Automatic control numbers show that the rotation error is less than 1/4 of a turn. Automatic control numbers show that the rotation error is less than 1/4 of a turn. Automatic control numbers show that the rotation error is less than 1/4 of a turn. Loading ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ A tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ

Lëk:
1. Elektrik ye tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u.
2. Dɛ̈ɛ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈
3. të cenë yen luɔ̈ɔ̈i thïn, të cenë yen yök ke ye kë cïï gam, ka tɛ̈n yenë yen luɔ̈ɔ̈i thïn, ka tɛ̈n yenë yen luɔ̈ɔ̈i thïn

Luɔi:
Kɔc ye luɔɔi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi.

Kuɔɔny:
1. ye tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n
2. 40 # mechanical oil should be added to the machine seat, and added to the oil mark center, and the remaining oil rope lubrication should be added to the oil mark center, and the remaining oil rope lubrication should be added to the oil mark center, and the remaining oil rope lubrication should be added to the oil rope lubrication. Masin yam ye luui kɔnɔ, a ye kɔnɔ waar, a ye kɔnɔ waar, a ye kɔnɔ waar, a ye kɔnɔ waar, a ye kɔnɔ waar, a ye kɔnɔ waar, a ye kɔnɔ waar, a ye kɔnɔ waar.
3.When the quality of the flower wheel on the flower wheel grinding head is 0.5g wear, the same set of flower wheels should be changed inside and outside position, and then wear 0.5g, should be eliminated.
4.The brush on the dust collector tube should be able to brush and the test surface, when the brush wear after affecting the dust collector quality should be replaced. 4.The brush on the dust collector tube should be able to brush and the test surface, when the brush wear after affecting the dust collector quality should be replaced.
5. Kä ye kek tɔ̈ɔ̈u në tɛ̈n ye kek tɔ̈ɔ̈u në tɛ̈n ye kek tɔ̈ɔ̈u në tɛ̈n ye kek tɔ̈ɔ̈u në tɛ̈n ye kek tɔ̈ɔ̈u në tɛ̈n ye kek tɔ̈

Ajuiɛɛr:
A tɔŋ ye kɔnɔ, a vacuum cleaner, a electrical control box.
Kɔnɔ ye baara ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ. Motor output end ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈
Kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye. To ye kɔrɔ ye 200N ye, o ye kɔrɔ ye 300N ye, a ye kɔrɔ ye 1N ye, a ye kɔrɔ ye 4ON ye, a ye kɔrɔ ye 2N ye (Note: a ye kɔrɔ ye, a ye kɔrɔ ye, a ye kɔrɔ ye, a ye kɔrɔ ye, a ye kɔrɔ ye, a ye kɔrɔ ye, a ye kɔrɔ ye, a ye kɔrɔ ye, a ye kɔrɔ ye, a ye kɔrɔ ye, a ye kɔrɔ ye, a ye kɔrɔ ye, a ye kɔrɔ ye).
A ye cɔl spindle lifting trip, a ye cɔl plane cam lifting, a ye cɔl spindle lifting trip, a ye cɔl spindle lifting trip, a ye cɔl spindle lifting trip.
A ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈ When products are manufactured, the assembled adhesive is used for abrasion resistance testing, if the user makes cement rubber sand wear resistance testing, then you must replace the adhesive sand wear resistance test for adhesive.
Luɔi de vacuum cleaner ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr.
Electric control box is used to control the power supply and horizontal turntable real turnover, it has a power voltage monitor, 0-999 times digital automatic control device and automatic parking device, the horizontal turntable real turnover can be set beforehand. The electric control box is used to control the power supply and horizontal turntable real turnover, it has a power voltage monitor, 0-999 times digital automatic control device and automatic parking device, the horizontal turntable real turnover can be set beforehand. Ka tɛmɛ, cam ye tɛmɛ piny ka tɛmɛ piny ka tɛmɛ piny ka tɛmɛ piny ka tɛmɛ piny ka tɛmɛ piny ka tɛmɛ piny ka tɛmɛ piny ka tɛmɛ piny ka tɛmɛ piny ka tɛmɛ piny ka tɛmɛ piny ka tɛmɛ piny ka tɛ

Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!