Pumps ye kek looi në kë de teknoloji ye kek looi në Germany Kä ye kek looi, pomp ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc Equipment kɛl. A lëu bï ya luɔ̈ɔ̈i dɛ̈t bɛ̈ɛ̈i, bɛ̈ɛ̈i, ku bɛ̈ɛ̈i Ka tɛmɛ recycling, ka tɛmɛ minilift, ka tɛmɛ kura Yer.
Nanjing Duan Water Treatment Wall PumpMateriɛl
Host Housing Stainless steel304
Axis Stainless steel420
Wheel Stainless steel304
Kɔmpi ye kɔmpi ye kɔmpi ye kɔmpi ye kɔmpi ye kɔmpi ye kɔmpi ye kɔmpi ye kɔmpi ye kɔmpi ye kɔmpi Stainless steel304
Pipe Wall & Doors Stainless steel304
Bar, wire rope, hanging ring Stainless steel304
Lifting device, steering device Stainless steel 304
Nuts, bolts, etc. fasteners Stainless steel316
Mechanical sealing (Mechanical sealing) Tungsten karbid/Tungsten karbid
Kabinet Kontrol Stainless Steel304
Nanjing Duan PumpKonstruksiyon
9.1 Wheel
A dilanna kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ Walasa ka kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl ye kɛl
9.2 Motor
Motor de submersible reflow pump ku wheel ye direct connected, ka insulation class de winding yeFGrade, maximum tɛmɛ
Degree155OCMotɛr dɔ̈ɔ̈r bɛ̈n ya tɔ̈ɔ̈u në kaam de load dɔ̈ɔ̈r, motɛr dɔ̈ɔ̈r bɛ̈n ya tɔ̈ɔ̈u në thaa tök15A rou, amma kaam ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye. Motor stator ye luɔɔi de thermal setup ye tɔ̈ɔ̈u në kɔrɔ̈ɔ̈ŋ de motɛr yic, ka tɔ̈ɔ̈u pins ye tɔ̈ɔ̈u në kɔrɔ̈ɔ̈ŋ de motɛr yic. Ka tɛmɛ, tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ80OCYe.
9.3 Bearing
Rotor motɛr ye dɛmɛ në ball bearing ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc
Lɔ̈ɔ̈i de pump ye cɔl submersible return pump bearings100000thaa;
9.4 Axis sealing
Pump ye bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi. A spiral tɔ̈u yɔ̈ɔ̈k tɔ̈u yɔ̈ɔ̈k tɔ̈u yɔ̈ɔ̈k tɔ̈u yɔ̈ɔ̈k
Slots, bï kä ye kek tɔ̈ɔ̈u ya cɔk tɔ̈ɔ̈u ya cɔk tɔ̈ɔ̈u ya cɔk tɔ̈ɔ̈u ya cɔk tɔ̈ɔ̈u. Ajuiɛɛr de sigl: Tungsten Carbide/Tungsten karbid.
9.5 Sisitɛm monitoring
Stator ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye140OCTɛɛr.
Motor stator cavity and oil chamber are equipped with leakage detectors to detect dynamic, quiet sealed leakage situations, and cut off power supply at the right time. Motor stator cavity and oil chamber are equipped with leakage detectors to detect dynamic, quiet sealed leakage situations, and cut off power supply at the right time.
Pump ye diwarParameters Teknikal
Model
Parameters teknis
QJBW2.5
Trafficm3/h
416
Yangzhengh
0.9
PuwolKw
2.5
Diameter wheelmm
400
Speed wheelr/min
740
Pii Push 力N
800
Motor gël
IP68
Motor insulation grade
F
Distance of wall pipe to poolm
5.6
Elektrik Source
380V, 3ph, 50Hz
Namba Quantity Set
3

Nanjing Duan Water TreatmentPost-Sales Service
Lɔ̈ɔ̈m de kɔc cï ɣɔɔc ee kë thiekic apɛi në luɔɔi de kɔc cï ɣɔɔc de kɔc cï ɣɔɔc de kɔc cï ɣɔɔc de kɔc cï ɣɔɔc. A ye raan ye luɔɔi looi, a ye raan ye luɔɔi looi, a ye raan ye luɔɔi looi, a ye raan ye luɔɔi looi, a ye raan ye luɔɔi looi, a ye raan ye luɔɔi looi.
1. Lɔ̈k raan ye ɣɔɔc ye raan ye ɣɔɔc ye raan ye ɣɔɔc ye raan ye ɣɔɔc ye raan ye ɣɔɔc ye raan ye ɣɔɔc ye raan ye ɣɔɔc ye raan ye ɣɔɔc ye raan ye ɣɔɔc ye raan ye ɣɔɔc
2(a) Ka kɛ̈l, ka kɛ̈l, ka kɛ̈l, ka kɛ̈l, ka kɛ̈l, ka kɛ̈l, ka kɛ̈l, ka kɛ̈l, ka kɛ̈l, ka kɛ̈l, ka kɛ̈l
3Projects engineering, will organize production, testing, inspection, and cooperate with customers' site acceptance according to the requirements of the tender documents. Projects engineering, will organize production, testing, inspection, and cooperate with customers' site acceptance. Projects engineering, will organize production, testing, inspection, and cooperate with customers' site acceptance according to the requirements of the tender documents.
4. LuɔiIS09001Standards organize raw materials, parts procurement and products production, inspection. Standards organize raw materials procurement, parts procurement and products production, inspection. Standards organize raw materials procurement, parts procurement and products production, inspection.
5N'a tɛ̈n yenë kɔɔr ya tɔ̈ɔ̈u, ka tɔ̈ɔ̈u, ka tɔ̈ɔ̈u, ka tɔ̈ɔ̈u, ka tɔ̈ɔ̈u, ka tɔ̈ɔ̈u, ka tɔ̈ɔ̈u, ka tɔ̈ɔ̈u, ka tɔ̈ɔ̈u, ka tɔ
6• Ka wargak tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n
7.Në kaam de garanti, ke raan ye luui në luɔɔi path në kë de kunnafoniw tɛ̈n yenë kek tɔ̈u thïn, na ye raan ye luui në luɔɔi de teknoloji ye kek tɔ̈u thïn, na ye raan ye luui në luɔɔi de teknoloji ye kek tɔ̈u thïn, na ye raan ye luui në luɔɔi de teknoloji Na cï yïn wɛ̈t cï gɔ̈t wala tɛlɛfɔn yök,24Gɛlɛr kɛ thaa/Lɔ̈k kä ye kek looi wala kä ye kek looi.
8.Na ye raan ye luɔ̈ɔ̈i ye raan ye luɔ̈ɔ̈i ye raan ye luɔ̈ɔ̈i ye raan ye luɔ̈ɔ̈i ye raan ye luɔ̈ɔ̈i ye raan ye luɔ̈ɔ̈i ye raan ye luɔ̈ɔ̈

