Shandong Runhe Environmental Water Treatment Equipment Co., Ltd. (Shandong Runhe Environmental Water Treatment Equipment Co., Ltd.)
Kuæa>Proizvodi>Kuen Town Hospital Wastewater Treatment Equipment Installation Requirements (Kuen Town Hospital Wastewater Treatment Equipment Installation Requirements)
Informacije o firmi
  • Nivo transakcije
    Član VIP
  • Kontakt
  • Telefon
    18764741986
  • Адрес
    Manhattan Building, Weifang
Kontakt sada
Kuen Town Hospital Wastewater Treatment Equipment Installation Requirements (Kuen Town Hospital Wastewater Treatment Equipment Installation Requirements)
Description: Kuonjuan City Hospital Wastewater Treatment Equipment Installation Requirements are used in residential areas, hotels, sanatoriums, schoo
Detalji proizvoda

Kuen Town Hospital Wastewater Treatment Equipment Installation Requirements (Kuen Town Hospital Wastewater Treatment Equipment Installation Requirements)

Kɔmpaniɛn min tɔŋ dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye

A. Equipment overview

Pii ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th Kä ye kek tɔ̈ɔ̈u në koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye

Ka tɛ̈n yenë kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ. Ye kë thiin koor cï kek ya looi bï ya kë thiin koor cï kek ya looi bï ya kë thiin koor cï kek ya looi bï ya kë thiin koor cï kek ya looi. Lɔnadɛ̈ ke kɔc ye kɔc cɔl 'hospital wastewater discharge standards' ye looi, man ye kɔc cɔl 'hospital wastewater discharge standards' ye kɔc cɔl 'hospital wastewater discharge standards' ye kɔc cɔl 'hospital wastewater discharge standards' ye kɔc cɔl 'hospital wastewater discharge standards' ye kɔc cɔl 'hospital wastewater discharge standards' ye kɔ Lɔnadɛ̈ yen ye koom ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ. Kä ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye. Lɔ̈k bɛ̈ɛ̈i kɔ̈k ku bɛ̈ɛ̈i kɔ̈k tɔ̈u në luɔɔi de jiiɛn ye kɔrɔ̈ɔ̈ŋ ye kɔrɔ̈ɔ̈ŋ. A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye
II. Lööŋ ye kɔc cɔl 'oral clinic' looi:

 

1. 500ml ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye

2. Kole bacteria ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ. A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye

3. Klɔr ye tɔ̈ɔ̈u ye 4 ~ 5mg/L. A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye

4. Pii ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ. A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye

■Käke luɔi

1, tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n

2, medical wastewater treatment equipment suitable for medium and small community medical clinics, oral clinics, hospital outpatient clinics, beauty and beauty units and other units requiring small wastewater treatment. 2, medical wastewater treatment equipment suitable for medium and small community medical clinics, oral clinics, hospital outpatient clinics, beauty and beauty units and other units requiring small wastewater treatment. A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye

3, laboratory koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye

■ Kä ye kek looi në ɣän ke kɔc ye kɔc kony:

1, tɛ̈n tɔ̈u piny, tɛ̈n tɔ̈u piny

2, luɔɔi ë rot, luɔɔi ë thiin koor, ka thiin koor ëbën

3、System processing effect stable and reliable

4, tɛ̈n cɛɛk, tɛ̈n cɛɛk, tɛ̈n cɛɛk

5, ka wïc bɛ̈ɛ̈i dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r

6, ozone disinfection, sterilization rate up to 99%, disinfection*

■ Proses masin

1, tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈

2, kä ye kek looi aye ozone disinfection + filtration adsorption.

3, ozone disinfection, a bacterial killing mechanism is destroying and oxidizing microbial cell membranes, cytoplasm, enzyme systems and nucleic acids, so as to cause bacteria and viruses to die quickly. 3, ozone disinfection, a bacterial killing mechanism is destroying and oxidizing microbial cell membranes, cytoplasm, enzyme systems and nucleic acids, so as to cause bacteria and viruses to die Ozon ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc 4, ye tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yen

Kuen Town Hospital Wastewater Treatment Equipment Installation Requirements (Kuen Town Hospital Wastewater Treatment Equipment Installation Requirements)

Kɔc ye luui në luɔɔi de pii ye kɔc cɔl environmental treatment industry adhil bɛ̈n ŋic lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ Kɔc kɔ̈k cï luɔɔi looi në ɣän ke jii ku ɣän ke jii cï luɔɔi yiic, a leŋ bɛ̈n tïŋ!

Lɔ̈ɔ̈i ë luɔɔi ë gël ë luɔɔi ë luɔɔi ë luɔɔi ë luɔɔi ë luɔɔi ë luɔɔi ë luɔɔi ë luɔɔi ë luɔɔi
Lɔ̈ɔ̈i ë gël ë luɔɔi Lɔ̈ɔ̈i ë gël ë luɔɔi pump room
1. Lɔ̈ɔ̈i ka tɛ̈n lɔ̈ɔ̈m ka tɛ̈n lɔ̈ɔ̈m ka tɛ̈n lɔ̈ɔ̈m
1. Ka tɛmɛ lööŋ ye looi, ka tɛmɛ kɛ̈ɛ̈r ye looi në lööŋ ye looi.
2. Lɔ̈ɔ̈ŋ ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye
3. ye tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n
4.Open rotating grid should be done strictly according to the rotating grid use requirements, and stop the machine for ten minutes, check whether there is a non-normal situation after the machine can leave the machine, never allow to put into operation, then leave. 4.Open rotating grid should be done strictly according to the rotating grid use requirements, and stop the machine for ten minutes, check whether there is a non-normal situation after the machine can leave the machine, never allow to put into operation, then leave.
5. Na ye koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u
II. Start, luɔɔi
1. Lɔ̈ɔ̈ŋ kɔc cï lɔ̈ɔ̈ŋ kɔc cï lɔ̈ɔ̈ŋ kɔc cï lɔ̈ɔ̈ŋ kɔc cï lɔ̈ɔ̈ŋ kɔc cï lɔ̈
2.Before the pump starts, you should take over the filling letter, introduce clean water lubricating rubber bearings, until the pump is out of water can be closed small, there is water dropping is suitable, check the pump bearing level of oil, ensure everywhere water, oil road is smooth.
3. ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen
4.When the pump starts, the machine must not stand beside people, after starting it should stay at least five minutes to check the equipment condition, if there is a non-normal vibration and sound or water output situation should immediately stop checking, never allow to put into operation immediately after leaving the pump.
5. tɛ̈n yenë pomp ye luui thïn, a dhil tɛ̈n yenë kë tɔŋ:
(1) Lɔ̈ɔ̈m ba baara ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ
(2) ye pump flow normal, check out the water pipe flow situation, according to the pool water level changes, estimate the pump operation time, at the right time and schedule. (2) ye pump flow normal, check out the water pipe flow situation, according to the pool water level changes, estimate the pump operation time, at the right time and schedule. (2) ye pump flow normal, check out the water pipe flow
(3) tïŋ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka t
(4) Nyuɔ̈ɔ̈th kɛ̈ɛ̈l, kɛ̈ɛ̈l kɛ̈ɛ̈l, kɛ̈ɛ̈l kɛ̈ɛ̈l.
(5) Ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
(6) Lɔ̈k ka tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n
6.Water pump electric motor in cold condition allows continuous start times six, two times interval time at least fifteen minutes. 6.Water pump electric motor in cold condition allows continuous start times six, two times interval time at least fifteen minutes. 6.Water pump electric motor in cold condition allows continuous start times six, two times interval time at least fifteen minutes.
3. Waktu dɔ̈ɔ̈r
1.To meet the process requirements or accept scheduling instructions, you should immediately stop the time, close its gates, after stopping the time, you should clean up the equipment used, and clean up the equipment around. 1.To meet the process requirements or accept scheduling instructions, you should immediately stop the time, close its gates, after stopping the time, you should clean up the equipment used, and clean up the equipment around.
2. Na cï tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë t
3. Pump ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc
4. Pump, pump, ventilator luɔɔi
1. Pump ye kɛ̈ɛ̈r de kɛ̈ɛ̈r de kɛ̈ɛ̈r de kɛ̈ɛ̈r de kɛ̈ɛ̈r de kɛ̈ɛ̈r de kɛ̈ɛ̈r
2. Pump de plunge adhil bï ya tïŋ në koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor.
3. Ventilator bɛ̈n looi ku tɔ̈ɔ̈u në kë de raan ye luui.
5. Kuɛl ye kɛ̈ɛ̈l ye kɛ̈ɛ̈l ye kɛ̈ɛ̈l ye kɛ̈ɛ̈l ye kɛ̈ɛ̈l
1. ye tɛ̈n yenë kä ye kek looi ya tɔ̈ɔ̈u thïn, ye tɛ̈n yenë kek tɔ̈ɔ̈u thïn ya tɔ̈ɔ̈u thïn ya tɔ̈ɔ̈u thïn ya tɔ̈ɔ̈u th

Kɔc ye luui në luɔɔi de pii ye kɔc cɔl environmental treatment industry adhil bɛ̈n ŋic lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ Kɔc kɔ̈k cï luɔɔi looi në ɣän ke jii ku ɣän ke jii cï luɔɔi yiic, a leŋ bɛ̈n tïŋ!

Lɔ̈ɔ̈i ë luɔɔi ë gël ë luɔɔi ë luɔɔi ë luɔɔi ë luɔɔi ë luɔɔi ë luɔɔi ë luɔɔi ë luɔɔi ë luɔɔi
Lɔ̈ɔ̈i ë gël ë luɔɔi Lɔ̈ɔ̈i ë gël ë luɔɔi pump room
1. Lɔ̈ɔ̈i ka tɛ̈n lɔ̈ɔ̈m ka tɛ̈n lɔ̈ɔ̈m ka tɛ̈n lɔ̈ɔ̈m
1. Ka tɛmɛ lööŋ ye looi, ka tɛmɛ kɛ̈ɛ̈r ye looi në lööŋ ye looi.
2. Lɔ̈ɔ̈ŋ ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye
3. ye tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n
4.Open rotating grid should be done strictly according to the rotating grid use requirements, and stop the machine for ten minutes, check whether there is a non-normal situation after the machine can leave the machine, never allow to put into operation, then leave. 4.Open rotating grid should be done strictly according to the rotating grid use requirements, and stop the machine for ten minutes, check whether there is a non-normal situation after the machine can leave the machine, never allow to put into operation, then leave.
5. Na ye koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u
II. Start, luɔɔi
1. Lɔ̈ɔ̈ŋ kɔc cï lɔ̈ɔ̈ŋ kɔc cï lɔ̈ɔ̈ŋ kɔc cï lɔ̈ɔ̈ŋ kɔc cï lɔ̈ɔ̈ŋ kɔc cï lɔ̈
2.Before the pump starts, you should take over the filling letter, introduce clean water lubricating rubber bearings, until the pump is out of water can be closed small, there is water dropping is suitable, check the pump bearing level of oil, ensure everywhere water, oil road is smooth.
3. ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen ka tɛmɛ yen
4.When the pump starts, the machine must not stand beside people, after starting it should stay at least five minutes to check the equipment condition, if there is a non-normal vibration and sound or water output situation should immediately stop checking, never allow to put into operation immediately after leaving the pump.
5. tɛ̈n yenë pomp ye luui thïn, a dhil tɛ̈n yenë kë tɔŋ:
(1) Lɔ̈ɔ̈m ba baara ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ
(2) ye pump flow normal, check out the water pipe flow situation, according to the pool water level changes, estimate the pump operation time, at the right time and schedule. (2) ye pump flow normal, check out the water pipe flow situation, according to the pool water level changes, estimate the pump operation time, at the right time and schedule. (2) ye pump flow normal, check out the water pipe flow
(3) tïŋ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka t
(4) Nyuɔ̈ɔ̈th kɛ̈ɛ̈l, kɛ̈ɛ̈l kɛ̈ɛ̈l, kɛ̈ɛ̈l kɛ̈ɛ̈l.
(5) Ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
(6) Lɔ̈k ka tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n
6.Water pump electric motor in cold condition allows continuous start times six, two times interval time at least fifteen minutes. 6.Water pump electric motor in cold condition allows continuous start times six, two times interval time at least fifteen minutes. 6.Water pump electric motor in cold condition allows continuous start times six, two times interval time at least fifteen minutes.
3. Waktu dɔ̈ɔ̈r
1.To meet the process requirements or accept scheduling instructions, you should immediately stop the time, close its gates, after stopping the time, you should clean up the equipment used, and clean up the equipment around. 1.To meet the process requirements or accept scheduling instructions, you should immediately stop the time, close its gates, after stopping the time, you should clean up the equipment used, and clean up the equipment around.
2. Na cï tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë t
3. Pump ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc
4. Pump, pump, ventilator luɔɔi
1. Pump ye kɛ̈ɛ̈r de kɛ̈ɛ̈r de kɛ̈ɛ̈r de kɛ̈ɛ̈r de kɛ̈ɛ̈r de kɛ̈ɛ̈r de kɛ̈ɛ̈r
2. Pump de plunge adhil bï ya tïŋ në koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor.
3. Ventilator bɛ̈n looi ku tɔ̈ɔ̈u në kë de raan ye luui.
5. Kuɛl ye kɛ̈ɛ̈l ye kɛ̈ɛ̈l ye kɛ̈ɛ̈l ye kɛ̈ɛ̈l ye kɛ̈ɛ̈l
1. ye tɛ̈n yenë kä ye kek looi ya tɔ̈ɔ̈u thïn, ye tɛ̈n yenë kek tɔ̈ɔ̈u thïn ya tɔ̈ɔ̈u thïn ya tɔ̈ɔ̈u thïn ya tɔ̈ɔ̈u th

Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!