Sɛnɛ, kɛnɛya ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈ Ku na yɔ̈ɔ̈k, tɛ̈n ye kɔc kɔ̈k tɔ̈u luɔɔi thïn, ka tɛ̈n ye kɔc kɔ̈k tɔ̈u luɔɔi thïn, ka tɛ̈n ye kɔc kɔ̈k tɔ̈u luɔɔi thïn, ka tɛ̈n ye kɔc kɔ̈k tɔ̈u luɔɔi thïn.
Sɔnɔ, duniɛ kɔnɔ, plastikɛ ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye. Në ye mɛn, kä ye kek looi në kɛnɛya, kɛnɛya, kɛnɛya, ku biotechnology dɛ̈t aye wïc bïk kɛ̈ɛ̈r ye kek looi në ɣän kɔ̈k yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic
A. Project Profile
Plastic Chemical Air Conditioning Engineering Production Workshop ee kɔc cï puɔ̈l apɛi ye looi, ku a ye kɔc cï puɔ̈l apɛi ye looi. A ye plastik looi, a ye DVD looi (a tɔŋ kunnafoniw), a ye DVD looi, a ye DVD looi, a ye DVD looi, a ye DVD looi, a ye DVD looi, a ye DVD looi, a ye DVD looi, a ye DVD looi, a ye DVD looi, a ye DVD looi, a ye DVD looi, a ye DVD looi, a ye DVD looi, a ye DVD looi A production line process for foreign introduction technology, very advanced, total introduction of 10 production lines. A production line process for foreign introduction technology, very advanced, total introduction of 10 production lines. A production line process for foreign introduction of technology, very advanced, total introduction of 10 production lines. A production line process for foreign introduction of technology, very advanced, total introduction of 10 production lines. Lɛɛr de luɔɔi bɛ̈ɛ̈i ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ Në kë de "Building Design Fire Prevention Specification" ku jɔl ya kä ye kek looi në luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔ
II. Parameters design
The disk production workshop total building area 2963m2, main production workshop area 1845m2, auxiliary production workshop area 1118m2, floor height 4.3m. Production workshop clean area air conditioning area is 1465m2, design parameters are:
Disk workshop t=22℃±2℃ φ=50%±5% 7th level cleanliness
Printing workshop t=22℃±2℃ φ=50%±5% 7th level cleanliness
Air condition zone t=18-26℃ φ=50-60% No level
Third, Cool Source System Design
3.1, Kuen ye looi
Cooling unit: screw type, rated cooling capacity: 615kw, two sets, one use and one ready
Cooling tower: ultra low noise reverse flow type, 200m3/h, two sets, one use and one ready
Water-water heat exchanger: corrugated plate type, heat exchange capacity 175kw four sets, two use and two preparation
3.2, koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom koom
3.2.1 Ka tɛmɛ kä ye kek looi në luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi Ku bɛ̈ɛ̈n, ka tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë
Cooling water unit prepares frozen water (7 ℃), after entering the water divider divided into three groups of water supply pipelines led, respectively sent to cleaning air conditioning end equipment, comfort air conditioning end equipment, water-water heat exchanger three air conditioning frozen water use points, after occurring hot and wet exchange, then by three groups of water return pipelines gathered at the water collector, then by pump pressurized into the cooling water unit, forming a frozen water cycle. Sisitɛm de jii ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ. Cooling tower and other cold source equipment are placed on the outside equipment room's floor, with reinforced concrete infrastructure high, the bottom of the water collector plate is slightly higher than the cooling water pump inlet pipe, so that the pump inlet pipe always remains full tube flow. Cooling tower and other cold source equipment are placed on the outside equipment room's floor, with reinforced concrete infrastructure high, the bottom of the water collector plate is slightly higher than the cooling water pump inlet pipe, Fan yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic yic
