Yongjia County Sea Pump Factory
Kuæa>Proizvodi>GBF Vertical Fluorinated Chemical Pipeline Pump
Informacije o firmi
  • Nivo transakcije
    Član VIP
  • Kontakt
  • Telefon
    13676799385
  • Адрес
    No.8, Linpu Road, Zhangburg Industrial Zone, Jinbei Town, Yongjia County, Zhejiang
Kontakt sada
GBF Vertical Fluorinated Chemical Pipeline Pump
Gäm unit ye GBF vertical lined fluorine chemical pipeline pump looi. Ka tɛmɛ ne hydraulic model ku tɛmɛ ne IS type centrifugal pump performance parame
Detalji proizvoda

Model maana
GBF立式衬氟化工管道泵型号意义

Produk Profile
Gäm unit ye GBF vertical lined fluorine chemical pipeline pump looi. Ka tɛmɛ ne hydraulic model ku tɛmɛ ne IS type centrifugal pump performance parameters, ka tɛmɛ ne pump ye cɔl vertical pump ye cɔl vertical pump ye cɔl vertical pump ye cɔl vertical pump. Kä ye kek looi ee kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r
Polyfluoroethylene (F46) ee tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ A bɛ se ka luui ka tɛmɛ 230-260°C, ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ.

Karakteristika Produk
1, pomp ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n
2, wheel ye tɔ̈ɔ̈u në motor bearing ye tɔ̈ɔ̈u në ye mɛn, ka bɛ̈n ya tɔ̈ɔ̈u në ye mɛn në ye mɛn në ye mɛn në ye mɛn në ye mɛn në ye mɛn në ye mɛn në ye mɛn në ye mɛn në ye mɛn në ye mɛn në ye mɛn në ye m
3. Axle seal ye tɔ̈u në mechanical seal ku mechanical seal ye tɔ̈u në kain ye tɔ̈u në kain ye tɔ̈u në kain ye tɔ̈u në kain ye tɔ̈u në kain ye tɔ̈u në kain ye tɔ̈u në kain ye tɔ̈u në kain ye tɔ̈u në
4, a lëu bï ya tɔ̈ɔ̈u në kë wïc në luɔɔi yic, man ye kɔc wïc në luɔɔi yic, man ye kɔc wïc në luɔɔi yic, man ye kɔc wïc në luɔɔi yic.
5, install and repair is easy, no need to remove the pipeline system, just remove the pump joint seat nut to extract all the rotor parts. 5, install and repair is easy, no need to remove the pipeline system, just remove the pump joint seat nut to extract all the rotor parts.
6, a lëu bï pomp ya tɔ̈ɔ̈u në tɛ̈n yenë yen tɔ̈ɔ̈u në tɛ̈n yenë yen tɔ̈ɔ̈u në tɛ̈n yenë yen tɔ̈ɔ̈u në t

Luɔi
A lëu bï ya looi në kaam de -85 ℃ ~ + 200 ℃, ku bï ya looi në kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam Kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye.

Parametre luɔɔi

Model
Traffic
Yangzheng
Speed
Puwol
m3/h
m
r/min
KW
GBF25-125
4
20
2900
0.75/1.1
GBF25-125A
3.6
20
2900
0.55/0.75
GBF25-160
4
32
2900
1.5/2.2
GBF25-160A
3.7
32
2900
1.1/1.5
GBF40-125
6.3
20
2900
1.1/1.5
GBF40-125A
5.6
16
2900
0.75/1.1
GBF40-160
6.3
32
2900
2.2/3
GBF40-160A
5.9
28
2900
1.5/2.2
GBF40-200
6.3
50
2900
4/5.5
GBF40-200A
5.9
44
2900
3/4
GBF50-125
12.5
20
2900
1.5/2.2
GBF50-125A
11
16
2900
1.1/1.5
GBF50-160
12.5
32
2900
3/4
GBF50-160A
11.7
28
2900
2.2/3
GBF50-200
12.5
50
2900
5.5/7.5
GBF50-200A
11.7
44
2900
4/5.5
GBF65-125
25
20
2900
3/4
GBF65-125A
22.3
16
2900
2.2/3
GBF65-160
25
32
2900
4/5.5
GBF65-160A
23.4
28
2900
4/5.5
GBF65-200
25
50
2900
7.5/11
GBF65-200A
23.5
44
2900
7.5/11
GBF80-125
50
20
2900
5.5/7.5
GBF80-125A
45
16
2900
4/5.5
GBF80-160
50
32
2900
7.5/11
GBF80-160A
46.7
28
2900
7.5/11
GBF80-200
50
50
2900
15/18.5
GBF80-200A
47
44
2900
11/15
GBF100-125
100
20
2900
11/15
GBF100-125A
89
16
2900
7.5/11
GBF100-160
100
32
2900
15/18.5
GBF100-160A
93.5
28
2900
11/15
GBF100-200
100
50
2900
22/30
GBF100-200A
93.5
44
2900
18.5/22
GBF125-125
160
20
2900
15/18.5
GBF125-125A
143
16
2900
11/15
GBF125-160
160
32
2900
22/30
GBF125-160A
150
28
2900
18.5/22
GBF150-125
160
20
2900
15/18.5
GBF150-125A
150
16
2900
11/15
GBF150-160
160
32
2900
22/30
GBF150-160A
150
28
2900
18.5/22

Lɔ̈ɔ̈i, jɔl la park
Lɔ̈k ka tɛ̈ɛ̈r:
1, tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛ
2, ye valve de exhaust lɔ̈ɔ̈m bï pump bɛɛ̈n ya lɔ̈ɔ̈m, ku ye valve de exhaust tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u.
3, tïŋ tɛ̈n yenë yɔɔdɛ looi.
4, tɩŋ pump ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k
5.High temperature type should be pre-heated first, heating speed 50°C/hour, to ensure all parts are heated uniformly.
Start:
1, ye valve ye kɔɔr looi.
2, ye valve ye tɔ̈ɔ̈u.
3, motor start, tïŋ a pump luɔɔi path.
4, adjust the output valve opening to the desired working condition, if the user has installed a flow meter or a pressure meter at the pump exit, should be adjusted by adjusting the output valve opening so that the pump can operate at the rated point listed in the parameter table, if the user has installed a flow meter or a pressure meter at the pump exit, should be adjusted by adjusting the output valve opening, measuring the pump's motor current, so that the motor can operate within the rated encounter current, if not, it will cause the pump overload operation (i.e. current operation) to make the motor burn. Lɔ̈ɔ̈m de valve de luɔɔi cï gɛɛr ee tɛ̈n yenë yen luɔɔi looi.
5, check the shaft sealing leakage situation, when normal mechanical sealing leakage should be less than 3 drops/min. 5, check the shaft sealing leakage situation, when normal mechanical sealing leakage should be less than 3 drops/min.
6, tɛmɛ motɛr, tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
Parki:
1, ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ
2, ye valve ye tɔ̈ɔ̈u.
3, ye motor dɔ̈ɔ̈r.
4, ye valve ye kɔɔr tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u.
5. Ni a tɛ̈ɛ̈m tɛ̈ɛ̈m tɛ̈ɛ̈m tɛ̈ɛ̈m tɛ̈ɛ̈m tɛ̈ɛ̈m tɛ̈ɛ

Lɔnadɛ
1, ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛ
2, tɛ̈n yenë yen tɔ̈ɔ̈u thïn, ka tɛ̈n yenë yen tɔ̈ɔ̈u thïn, ka tɛ̈n yenë yen tɔ̈ɔ̈u thïn.
3, a ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ
4, ago ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛm
5, ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈
6, pump divides hard connection installation and flexible connection installation into two types. 6, pump divides hard connection installation and flexible connection installation into two types. 6, pump divides hard connection installation and flexible connection installation into two types. 6, pump divides hard connection installation and flexible connection installation into two types.

Kɛl-kɛl-kɛl-kɛl-kɛl-kɛl-kɛl-kɛl-kɛl-kɛl-kɛl-kɛl-kɛl-kɛl

Failure phenomena
Lɛɛr dɛ
Metode de exclusion
1. Pump dɔ̈ŋ dɔ̈ŋ dɔ̈ŋ dɔ̈ŋ dɔ̈ŋ dɔ̈ŋ dɔ̈ŋ dɔ̈ŋ dɔ̈ŋ a、 Valve de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi
b、 Motor ye tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n
c、 Gas ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u.
d、 Pump cïï lɔ̈ɔ̈m, ka tɔ̈u piny në pump cavity.
e、 Pii dɔ̈ɔ̈r ye ɣɔɔc, pii dɔ̈ɔ̈r ye ɣɔɔc, pii dɔ̈ɔ̈r ye ɣɔɔc.
f、 Pipeline ye kɛ̈ɛ̈r ye, pump ye kɛ̈ɛ̈r ye.
a、 Gɛlɛ, ka tɛmɛ.
b、 Lɔ̈ɔ̈m motɛr dɔ̈ɔ̈r, ku jɔl ya motɛr dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r.
c、 Lɔ̈k kä ye kek tɔ̈ɔ̈u yiic, ku tɔ̈ɔ̈u bï gas ya tɔ̈ɔ̈u yiic.
d、 Lɔ̈ɔ̈m ye kɔnɔ ku lɔ̈ɔ̈m ye kɔnɔ ku lɔ̈ɔ̈m ye kɔnɔ ku lɔ̈ɔ̈m ye kɔnɔ.
e、 Stop time, check, adjust (ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ
f、 Lɔ̈k tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈
2. Pump ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u a、 1. Lɛ̈k bɛ̈n.
b、 Pipeline, pump flow wheel part blocked, water scale stagnation, valve opening insufficient. Pipeline, pump flow wheel part blocked, water scale stagnation, valve opening insufficient. Pipeline, pump flow wheel part blocked, water scale stagnation, valve opening insufficient. Pipeline, pump flow wheel part blocked, water scale stagnation, valve opening insufficient.
c、 Voltage tɔ̈u.
d、 Wheel wear.
a、 Lɔ̈k 1.
b、 Lɔ̈k kä ye kek tɔ̈ɔ̈u, ku lɔ̈k valves.
c、 Dɔɔr.
d、 Gɛl wheel.
3, duniŋ dɔŋ a、 Luɔi de trafik ye tɔ̈ɔ̈u.
b、 A cɔl suction.
c、 Pump bearing ye cɔl wear.
a、 Lɔ̈ɔ̈m de flow, tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u.
b、 Dɔɔr.
c、 Gɛɛr bearings.
4, Vibration a、 Pipeline dɔ̈ŋ dɔ̈ŋ dɔ̈ŋ dɔ̈ŋ dɔ̈ŋ dɔ̈ŋ dɔ̈ŋ dɔ̈ŋ dɔ̈ŋ.
b、 Liquid ye kek gas ye kek mat.
c、 A bɛ gas corrosion looi.
d、 Bearing ye cɔk.
e、 Motor ye tɛmɛ në kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam.
a、 Pipe dɔ̈ŋ.
b、 Lɔ̈k bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i.
c、 Vacuum dɔ̈ɔ̈r.
d、 Gɛɛr bearings.
e、 Lɔ̈k 5.
5, Motor Heating a、 Lɔ̈ɔ̈m dɔ̈ŋ, ku ye baara dɔ̈ŋ.
b、 Lɔ̈k.
c、 Motor bearing ye cɔk.
d、 Voltage dɔ̈ŋ.
a、 Lɔ̈k valve yic.
b、 Cek ka cɔl exclusion.
c、 Gɛɛr bearings.
d、 Dɔɔr.
6, Pump water leakage a、 Mechanical sealing wear (Mechanical sealing wear).
b、 Pump tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u
c、 A tɛ̈ɛ̈r tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u.
d、 Lɔ̈k bolt loose.
a、 Gɛɛr.
b、 Welding ka waar.
c、 Gɛɛr.
d、 A gɛɛr.


Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!