Në tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ
Air conditioning water systems, wala industrial water systems wɛrɛw, ye pip juëc ye kɔc kony.Container pressure non-standard yeKɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔcPressure containerAkutnhom de luɔɔi ye kɔc cï puɔ̈ɔ̈c, man wïc bï thermometer de pressure meter, valve de exhaust, valve de gël, valve de lɔ̈ɔ̈m, ku jɔl ya, man wïc bï valve de pressure regulation tääu në kaam de 2 containers, ku man wïc bï yen ya kony në dhöl de lɔ̈ɔ̈m.
1.Heat exchangerPump ye tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈nHeat changer unitLɔ̈k ba pomp ye cɔl manual test pressure pump ya luɔ̈ɔ̈i.
2.Heat exchanger test pressure pump and test pressure blind plate must be connected between two ends as a live form of metal hose, to reduce the site construction work, and also facilitate multiple equipment test pressure. 2.Heat exchanger test pressure pump and test pressure blind plate must be connected between two ends as a live form of metal hose, to reduce the site construction work, and also facilitate multiple equipment test pressure.
3.Heat exchanger test pressure tool design, manufacturing must have certain versatility, don't restrict to a single device. 3.Heat exchanger test pressure tool design, manufacturing must have certain versatility, don't restrict to a single device.
Ajuiɛɛr de koom:
Pii ye tɛ̈n tɔ̈ɔ̈u ye tɛ̈n tɔ̈ɔ̈u ye tɛ̈n tɔ̈ɔ̈u ye tɛ̈n tɔ̈ɔ̈u ye tɛ̈n tɔ̈ɔ̈u ye Pii ye tɔ̈ɔ̈u në pii ye tɔ̈ɔ̈u në piyii ye tɔ̈ɔ̈u në piyii ye tɔ̈ɔ̈u në piyii ye tɔ̈ɔ̈u në piyii ye tɔ̈ɔ̈u në piyii ye tɔ̈ɔ̈u në piyii ye tɔ̈ɔ̈ Pii ye tɔ̈ɔ̈u ye koom ye tɔ̈ɔ̈u ye koom ye tɔ̈ɔ̈u ye koom ye tɔ̈ɔ̈u ye koom ye tɔ̈ɔ̈u ye koom ye tɔ̈ɔ̈u ye koom ye tɔ̈ɔ̈u ye koom ye tɔ̈
Pii tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n Dɔŋ tɛ̈n yenë yen luɔɔi looi, a tɛ̈n yenë yen luɔɔi looi, a tɛ̈n yenë yen luɔɔi looi. A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye
1) Air conditioning water system, or other industrial water systems, also manages several branch pipelines, including the return water branch and the water supply branch, but its large number of DN350-DN1500 different, made with steel plates, belongs to the air conditioning water system, or other industrial water systems, also manages several branch pipelines, including the return water branch and the water supply branch, but its large number of DN350-DN1500 different, made with steel plates, belongs to thePressure containerKä ye looi në kɔc ye kɔc looi në kɔc ye kɔc looi në kɔc ye kɔc looi në kɔc ye kɔc looi në kɔc ye kɔc looi në kɔc ye kɔc looi në kɔc ye kɔc looi në kɔc ye kɔc looi në kɔc ye kɔc looi në kɔc ye kɔc looi në kɔc ye kɔc looi në k A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye
2) Tɛ̈n yenë piny tɔ̈ɔ̈u thïn, ke piny tɔ̈ɔ̈u thïn ee piny tɔ̈ɔ̈u thïn ye piny tɔ̈ɔ̈u thïn ye piny tɔ̈ɔ̈u thïn ye piny tɔ̈ɔ̈u thïn ye piny tɔ̈ɔ̈u A tɛ̈n tɔ̈u, a tɛ̈n tɔ̈u DN25-DN40. Kä juëc ye import. A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye
3) Pii de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi de piyi Hydrator de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy de piy Kɔn tɛ̈n yen, ka tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye
