Salt dry wet corrosion test box,Carbide salt mist test boxA tɔŋ bï ya tɛmɛ bï ya tɛmɛ bï ya tɛmɛ bï ya tɛmɛ bï ya tɛmɛ bï ya tɛmɛ bï ya tɛmɛ bï ya tɛmɛ bï ya tɛmɛ bï ya tɛmɛ bï ya tɛmɛ bï ya tɛmɛ bï ya Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ. Kä ye looi bï kä ye kek looi ya tɛmɛ bï kek ya tɛmɛ bï kek ya tɛmɛ bï kek ya tɛmɛ bï kek ya tɛmɛ bï kek ya tɛmɛ bï kek ya tɛmɛ bï kek ya tɛmɛ bï kek ya tɛmɛ bï
A. Carbide salt mist test boxReference Standards
Kä ye kek them aye kek looi në kë cï gam në kë cï gam në kë cï gam në kë cï gam në kë cï gam në kë cï gam në kë cï gam në kë cï gam në kë cï gam në kë cï gam në kë cï gam në kë cï gam në kë GBJ82-85 <unk>Concrete Long Term Durability Test<unk> ku DL/T5150-2001 <unk>Waterworks Concrete Test Procedure<unk> Carburization Test Equipment
Ku ye test method: Neutral salt mist test (NSS test), salt mist test (SS test), acetate mist test (ASS test), copper accelerated acetate mist test (CASS test) and other salt mist test methods;
II. Model Specifications
Nyuɔ masin |
Mixed gas salt mist corrosion test box,Carbide salt mist corrosion test box,Carbide salt mist test box |
||||
Note |
1. Kä ye kek tɔ̈ɔ̈u në tɛmɛ̈ɛ̈r de ɣän kɔ̈k yiic (QT) 25°C. A tɛmɛ tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n |
||||
Model |
Y/H2S-150 |
Y/H2S -250 |
Y/H2S -750 |
Y/H2S -010 |
|
Studio size |
450×600×450 |
600×900×500 |
750×1100×500 |
850×1300×550 |
|
Dimensions |
680×1300×1050 |
850×1620×1120 |
1000×1950×1320 |
1150×2200×1370 |
|
Puɔth (kw) |
1.8 |
2.5 |
3.2 |
4.2 |
|
Seks
Can
Finger
Marka |
Temperature Range |
35℃~50℃ |
|||
Kɛnɛya |
±0.5℃/±2℃ |
||||
Range de humidité |
93%~98% R.H |
||||
Salt mist sediment |
1~2mL/80cm2·H |
||||
Gas concentration range |
20±2% |
||||
Degree of humidity (Degree of humidity) |
+2% -3% R.H |
||||
Temperature Operating Control System (Sistɛm Kontrol) |
Kontrol |
Import programming touch-type real color LCD screen display. Chinese English Dialogue; A ye 120 program, 99 segments per group, 999 steps per segment, a ye 99 hours 59 minutes per period, a ye 99 hours 59 minutes per segment, a ye 99 hours 59 minutes per segment, a ye 99 hours 59 minutes per segment, a ye 99 hours 59 minutes per segment, a ye 99 hours 59 minutes per segment, a ye 99 hours 59 minutes per segment |
|||
Metod output |
Pulse solid state relay output; |
||||
Sensor |
Platinum resistance PT100Ω/MV |
||||
Sistɛm Heating |
Titanium-nickel-chromium electric heater ye cɔl corrosion resistant |
||||
Sistɛm nji |
Low water level switch control, automatic water up, automatic disconnect |
||||
Heating Method |
P.I.D+SRR Synchronous Coordination Heating |
||||
Sistem gël |
Lɔ̈ɔ̈m, koor koor, koor koor, koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor |
||||
Timing function |
0.1 ~ 999.9 (S, M, H) lëu bï ya waar |
||||
Fittings Material Configuration (Fittings Material Configuration) |
Käke Material |
PVC ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r |
|||
Material ye kɔrɔ |
Import transparent PVC sheet, corrosion resistance, temperature resistance strong, box cover angle designed to 120 degrees |
||||
Metod sealing |
Ka tɛmɛ njil ye kɔnɔ, ka gas ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ |
||||
Konfigurasiɔn Standart |
Anti-corrosion V-type sample frame, anti-corrosion O-type sample bar (random) |
III. Bayan de Delivery
1 raan ye kɔc gäm ye kɔc gäm ye kɔc gäm ye kɔc gäm ye kɔc gäm ye kɔc gäm ye kɔc gäm ye kɔc gäm ye kɔc gäm ye kɔc gäm;
2.Supplier responsible for installing debugging, operation introduction, until the demanding party workers start operating;
3. Garanti ye run tök looi, ka bɛ̈n looi në aköl cï yen tääu thïn. Kɔc ye ɣaac aye kɔc ye ɣaac aye kɔc ye ɣaac aye kɔc ye ɣaac aye kɔc ye ɣaac aye kɔc ye ɣaac aye kɔc ye ɣaac aye kɔc ye ɣaac aye kɔc ye ɣaac