Temperature dɔ̈ŋCold & Hot Impact BoxBayan:
Kän ye looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi.
Test box piny ye high temperature zone, high temperature zone ye compressor, top ye test zone, top ye low temperature zone, electronic control cabinet ye right side.
Dɛ̈ɛ̈r ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye.
Kɔc ye tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈ Ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛm
A. Model ku Specifications:
1, Model: GDCJ-150
2, Studio size (mm): GDCJ-150 500 × 500 × 500
3, tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛm
4, low greenhouse temperature range: -40 ~ 0 ℃
5. Waktu ye yɛl: ≤15s
6. Wakt ye kɔc lɔ̈ɔ̈m: ≤5min
7, tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
8, tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
9, tɛmɛ tɛmɛ: ≤2℃
10, tɛmɛ dɔ̈ɔ̈r: 200 ℃ ~ 300 ℃
11, kaam ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u
12, Low greenhouse cooling time +25℃~-70℃≤35min
Note: Performance indicators are measured at ambient temperature of 15~25°C without loading
II. Struktur ku Material
1, kä ye kek looi: SUS3042 ye kek looi
2, Housing material: anti-rust treatment, high quality cold rolled steel plate. Surface spraying color ye bleu
3, insulation material: ultrafine glass insulation cotton, insulation layer thickness is 100mm.
4, Heater: Nickel chromium alloy electric heater, 5 years lifetime warranty
Third, Temperature Control System
1, Temperature controller: Korean original imported Chinese touch screen TEMI programmable controller
2、Control method:Value/programming
3, Thermometer Specification: Precision: High and low temperature ± 0.1%
Resolution: ±0.01 ℃
4, Testing body temperature: PT100 test sensor
5, Timing Control: You can set the test time at will, and the test ends automatically shutting down. 5, Timing Control: You can set the test time at will, and the test ends automatically shutting down. 5, Timing Control: You can set the test time at will, and the test ends automatically shutting down.
4. Refrigeration System
1, Refrigeration unit French imported Tecon refrigeration unit closed completely
2, Cooling Method Double-Stage Compression Refrigeration
3, cooling method Air cooling
5, security protection device, beeper voice control alert
1, gël power failure
2, gël against leakage
3. Compressor Oil Pressure, Overpressure, Overload Protection
4, gël tɛmɛ
5, Heater short circuit, overload protection
6, Fan overload gël
Kuen: 380V 50Hz
Puwol: 18KW