Shenzhen Tuyi Instrument Equipment Co., Ltd.
Kuæa>Proizvodi> <unk> Smart electric meter load switch detection test device
Grupe proizvoda
Informacije o firmi
  • Nivo transakcije
    Član VIP
  • Kontakt
  • Telefon
    18565803905
  • Адрес
    Shenzhen Bao'an District Fuyong Street Bridge Head Rong Tree Road 22, 4th Floor
Kontakt sada
<unk> Smart electric meter load switch detection test device
A, ka tɛmɛ, masini kënë ee tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛm
Detalji proizvoda

I. Bayan
Kä ye kek looi aye tɛmɛ Q/GDW 1354-2013 <unk>National Grid Company Smart Power Meter Function Specification<unk>, Q/GDW 1365-2013 <unk>National Grid Company Smart Power Meter Information Exchange Safety Certification Technical Specification<unk>, DL/T 645-2007 <unk>Multifunctional Power Meter Communication Statute<unk> ku DL/T 460-2005 <unk>AC Power Meter Inspection Device Inspection Procedure<unk>, Q/G·DW 11421-2015 <unk>Power Meter External Circuit Breaker Technical Specification<unk>, Q/GDW 11179.8-2015 <unk>Power Meter Components Equipment Technical Specification<unk> Part 8: Load Switch<unk>. Kä cï kek ya looi në ɣän kɔ̈k yiic, ka cï kek ya looi në ɣän kɔ̈k yiic, ka cï kek ya looi në GB14048-2012 "Low Voltage Switching Equipment Technical Specification". A lëu bï ya looi në kë wɛ̈t cï kek ya looi në lööŋ yiic (tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈r
Kä ye kek looi aye kek looi në PLC, ye kek looi në kaam de raan-raan-raan-raan-raan-raan-raan-raan-raan-raan-raan-raan-raan-raan-raan-raan-raan-raan-raan.
A tɔŋ function test bench, detachment test bench.
II. Kuen ye looi
1.Functional test bench
1) Masin ye tɛmɛ kä tɔ̈u piny: (tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
2) Power input: single phase 220V, 50HZ, 10KVA;
3) Kä ye kek looi aye kek looi në aluminium, peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel
4) dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ
5) 4 million wheels tɔ̈u piny, a nɔgɔya bɛ̈ɛ̈i;
6) Panel de 15 circuit breaker clamps;
7) Tool clamping: ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n
8) Wiring method: Stable and reliable, beautiful and generous, simple, using parallel method wiring, each station independent control, reserved in the desk body extended cascade interface. 8) Wiring method: stable and reliable, beautiful and generous, simple, using parallel method wiring, each station independent control, reserved in the desk body extended cascade interface.
9) Test rack ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈
10) Tool clamping: ye tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yen
11) Lɔ̈ɔ̈i de luɔɔi: ka tɛmɛ ka tɛmɛ, ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka
2.Disconnect test bench
1) Masin ye tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
2) Power input: single phase 220V, 50HZ, 10KVA;
3) Kä ye kek looi aye kek looi në aluminium, peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel peel
4) A dɔŋ ye 1.5 m (long) * 0.78 m (wide) * 1.5 m (high);
5) 4 million wheels tɔ̈u piny, a nɔgɔya bɛ̈ɛ̈i;
6) Panel de 15 circuit breaker clamps;
7) Tool clamping: ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ
8) Wiring method: Stable and reliable, beautiful and generous, simple, using parallel method wiring, each station independent control, reserved in the desk body extended cascade interface. 8) Wiring method: stable and reliable, beautiful and generous, simple, using parallel method wiring, each station independent control, reserved in the desk body extended cascade interface.
9) Test rack ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈
10) Tool clamping: ye tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yen
11) Wiring method: each station according to 2P switch wiring method, the current uses all poles serial method introduced. 11) Wiring method: each station according to 2P switch wiring method, the current uses all poles serial method introduced. 11) Wiring method: each station according to 2P switch wiring method, the current uses all poles serial method introduced. Current adopting external adopting the same convenient and durable contacts, satisfying the maximum 1.45In current test. Current adopting external adopting the same convenient and durable contacts, satisfying the maximum 1.45In current test. Current adopting external adopting the same convenient and durable contacts, satisfying the maximum 1.45In current test. Switch ye tɔ̈u nhial ku jɔl, ku a tɔ̈u ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka
12) Lɔ̈ɔ̈i de luɔɔi: ka tɛmɛ ka tɛmɛ, ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka
3. Software function
1) Software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software de software
3) User Management: ye kɔc cï gam ye kɔc cï gam ye kɔc cï gam ye kɔc cï gam ye kɔc cï gam ye kɔc cï gam ye kɔc cï gam ye kɔc cï gam ye kɔc cï gam.
4) System interface requirements: Interface is divided into three parts: setup zone, operation zone, waveform display zone, test data display zone.
5) Setting parameters: including testing item selection, testing current selection. 5) Setting parameters: including testing item selection, testing current selection. 5) Setting parameters: including testing item selection, testing current selection. Test time setup, etc.;
6) Kuen de luɔɔi: nɔŋgɔn: button de lock; Button ye cɔl split gate; data tɔ̈ɔ̈u;
7) Dɛ̈ɛ̈r ye data nyuɔɔth: nɔŋgɔ̈ŋ: tɛ̈n tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u I2t lëu bï ya looi; Ieff-totel ye tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈ Ieff-half ye tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë I wɛ̈ɛ̈r ye kɔn tɔ̈ɔ̈u në kaam juëc; Lɛ̈k tɛ̈n yenë circuit breaker switch tɔ̈u thïn; Computer ye tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
8) Lɔ̈ɔ̈i de kä ye kek tɔ̈ɔ̈u: Na cï tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë t A lëu bï nambaw ya tɔ̈ɔ̈u në kɔmpiöta yic bï a gɔ̈ɔ̈r;
Third, test project parameters

1. Level Control Test
1) Ajuiɛɛr adhil bɛ wɛɛr Table 9
2) Voltage control: AC220V, voltage resolution 0.1V, ±1%.
3) Kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl

2. Kuen de drive
1) Test requirements: 23 ± 2 ℃ environment, apply 70% ~ 120% rated control voltage, serial 100kΩ ± 1% resistance. Voltage signal adds to the control end of the circuit breaker, the circuit breaker should be able to reliably operate 50 times, each operation completed after the interval time of 10s.;
23 ± 2 ℃ ɣän kɔ̈k yiic, a tɛ̈n yenë 380V ya tɔ̈ɔ̈u, a tɛ̈n yenë 100kΩ ya tɔ̈ɔ̈u (±% 1). Signal de voltage acï bɛ̈n tääu në baŋ de circuit breaker.
Ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ
2) Kä ye kek looi AC voltage: 0 ~ 450V adjustable, resolution 0.1V
3) ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot
4) ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot

3.Phase leakage current test
1) Test requirements: after the control unit closed, each phase consumption of stable state current should be less than 0.2mA, equipment should be able to automatically test each two phase leakage current, current resolution 0.001mA, after testing finished to automatically judge whether it qualifies
2) Kä ye kek tɔ̈ɔ̈u në ye mɛn: 0.01 ~ 0.3mA

4. Lɔ̈ɔ̈m de wɛ̈ɛ̈r de wɛ̈ɛ̈r de wɛ̈ɛ̈r de wɛ̈ɛ̈r
1) Test requirements: control unit for semi-automatic and fully automatic control modes of circuit breakers should meet the requirements of 4.2.8. 1) test requirements: control unit for semi-automatic and fully automatic control modes of circuit breakers should meet the requirements of 4.2.8.
Tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yen
2) Timing test time: 0 ~ 999.9s
3) Power supply: AC voltage 0 ~ 450V adjustable, resolution 0.1V

5.Automatic closure time test
1) Test requirements: For fully automatic control mode circuit breakers for closure time testing, it should meet the requirements of 4.3.7. 1) Test requirements: For fully automatic control mode circuit breakers for closure time testing, it should meet the requirements of 4.3.7.
Sisitɛm ye tɔ̈ɔ̈u, ku circuit breaker ye tɔ̈ɔ̈u në tɛ̈n yenë yen tɔ̈ɔ̈u thïn, ku bɛ̈n tɛ̈n yenë yen tɔ̈ɔ̈u thïn
2) Timing test time: 0 ~ 999.9s

6. Same-time test
1) Test requirements: measure the closure and separation time of the circuit breaker poles, should meet the requirements of 5.2.3. 1) Test requirements: measure the closure and separation time of the circuit breaker poles, should meet the requirements of 5.2.3.
Ka tɛ̈n yenë circuit breaker looi, ka tɛ̈n yenë contact point looi, ka tɛ̈n yenë contact point looi, ka tɛ̈n yenë circuit breaker looi. Ku të cenë yen tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ Tɛ̈n yenë yen tɔ̈ɔ̈u thïn, ɣän ke kɔc bɛɛ̈i adhil bɛ̈n tɔ̈ɔ̈u thïn, ku thaa tɔ̈ɔ̈u thïn adhil bɛ
2) Power supply control: AC voltage 0 ~ 450V adjustable, resolution 0.1V
3) Lɔ̈k tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r: 0 ~ 999.9ms;
4) Lɔ̈k tɛ̈ɛ̈r: 0 ~ 999.9ms;

7. Features ye looi
Parameters of instantaneous disconnection: Parameters of instantaneous disconnection: Parameters of instantaneous disconnection: Parameters of instantaneous disconnection: Parameters of instantaneous disconnection:
1) output transient maximum current ((A): 1000 ((4S));
2) Tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr
3) Kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl
4) ye tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈
5) Wakat ye looi: 0 ~ 999ms;
6) kaam ye tɔ̈ɔ̈u: ≤±10%;
7) Lappol: 15 Lappol
8) Voltage output: 0 ~ 5V
9) Waktu tɛth: ≤200ms
Parameters of delay disconnection: Parameters of delay disconnection: Parameters of delay disconnection: Parameters of delay disconnection: Parameters of delay disconnection: Parameters of delay disconnection:
1. output maximum current (A): 1 ~ 300 (2h);
2.Current test accuracy: ≤±2%;
3. Automatic constant current;
4. Voltage: 0 ~ 5V
5.Time range: 1 ~ 999999s;
6. Timing error: ≤±1%;
7. Kuen: 15 Kuen
8. Tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
1) Thermocouple model: T type;
2) 16 tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
3) Temperature resolution 0.1 degrees;
4) Kuen ye 0 ~ 200 degrees;

Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!